Software engineering: Cost Estimating
Showing posts with label Cost Estimating. Show all posts

Outline : Overview Estimation Process Cost Estimation & Analysis Depreciation Analysis CAPEX/OPEX Analysis Feasibility Study Financial A...


Outline:
  • Overview
  • Estimation Process
  • Cost Estimation & Analysis
  • Depreciation Analysis
  • CAPEX/OPEX Analysis
  • Feasibility Study
  • Financial Analysis
  • Value analysis
  • Case Studies
Download also:
Cost Engineering is the application of scientific principles and techniques to problems of estimation; cost control; business planning and management science; profitability analysis; project management; and planning and scheduling.
Download

The cost management plan guides these four processes. Created during the project planning phase, the cost management plan is a document that...


The cost management plan guides these four processes. Created during the project planning phase, the cost management plan is a document that defines how you manage, control, and communicate a project's costs in order to complete the project on budget.

Purpose: 
The purpose of cost management is to ensure project costs are planned based on project need, tracked, changed according to procedure and reported on a regular basis. This plan has two parts; the first part deals with project cost management and the second part addresses the state budget process.
This document will be reviewed and updated annually or as the result of continuous improvement in the project’s cost management processes.

Scope:
The scope of the Cost Management Plan is the processes, roles, and tools used to plan and manage project costs throughout the life of the project.
Cost Planning
In the construction industry, a cost plan is used as a way of controlling the estimated costs during the design and construction phases of a project. That means that cost plans are living artifacts, just like project management plans. They must be managed throughout the lifecycle of any initiative in any industry.

Download

The Cost Management Plan clearly defines how the costs on a project will be managed throughout the project’s lifecycle. It sets the format ...


The Cost Management Plan clearly defines how the costs on a project will be managed throughout the project’s lifecycle. It sets the format and standards by which the project costs are measured, reported and controlled. The Cost Management Plan:
1-Identifies who is responsible for managing costs
2-Identifies who has the authority to approve changes to the project or its budget
3-How cost performance is quantitatively measured and reported upon
4-Report formats, frequency and to whom they are presented.
The Project Manager will be responsible for managing and reporting on the project’s cost throughout the duration of the project. During the monthly project status meeting, the Project Manager will meet with management to present and review the project’s cost performance for the preceding month. The performance will be measured using earned value. 

The Project Manager is responsible for accounting for cost deviations and presenting the Project Sponsor with options for getting the project back on budget. The Project Sponsor has the authority to make changes to the project to bring it back within budget.
Download also:

This research aims at emphasizing the significance of sound management and cost planning from the beginning of the project undertaking in or...

This research aims at emphasizing the significance of sound management and cost planning from the beginning of the project undertaking in order to facilitate the proper establishment for conducting and systemizing the project costs. Also, to determine the major obstacles that affect the management and scheduling of construction costs and to suggest solutions through demonstrating the roles of the parties involved in the project. According to the preliminary information, data, and exploratory readings collected about this matter.

Download

Planning :  Process of choosing the method and order of work Scheduling :  Process of determining the interrelationship of associated timing...

Planning: Process of choosing the method and order of work
Scheduling: Process of determining the interrelationship of associated timings of operations.

Steps in Construction Scheduling:

  • 1-Splitting of the project into work activities 
  • 2-Determining logic relationships/interrelationships between activities.
  • 3-Construction of Network Diagrams.
  • 4-Assigning durations to work activities.
  • 5-CPM Calculations resulting in start times, finish times and float calculations of activities.
  • 6-Marking of Critical Path
  • 7-Construction of Bar Charts Time-phased diagrams

Project Cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be...

Project Cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget”
Download

Estimates in the building and construction projects Download

Estimates in the building and construction projects


Download

Cost Engineering makes it possible to increase profits, not so much by advancing prices as by revealing the weak points in the making and se...

Cost Engineering makes it possible to increase profits, not so much by advancing prices as by revealing the weak points in the making and selling effort, so that special attention may be given to strengthening them, thereby decreasing existent unseen losses which absorb part or all of the normal profits.