A bill of quantities (BOQ) is a document used in tendering in the construction industry/supplies in which materials, parts, and labor (and their costs) are itemized.The bill of quantities (sometimes referred to as ‘BoQ’) is a document prepared by the cost consultant (often a quantity surveyor) that provides project-specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation.
A bill of quantities (BOQ) is a document used in tendering in the construction industry/supplies in which materials, parts, and labor (and t...
About author: Manager
I work as a Civil Engineer. I want to learn everything new in the field of project management and to participate with those interested in learning this field.
Subscribe to:
Post Comments (Atom)
0 Comment: