This video demonstrates benefits of using Bar Charts to reduce overall project duration.
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT).
Download:
Download:
0 Comment: