An introduction to  work breakdown structure: The Work Breakdown Structure (WBS) is a hierarchical decomposition of the project objectives i...

Creating a Work Breakdown Structure with Microsoft Project

learn how to Creating a Work Breakdown Structure with Microsoft Project

An introduction to work breakdown structure:

The Work Breakdown Structure (WBS) is a hierarchical decomposition of the project objectives into deliverable-oriented tasks that are executed by the project team to accomplish the overall project goals. 

The WBS forms the backbone of all the project planning activities. The WBS divides the scope of the project work into smaller, manageable work packages for maintaining better control of the project activities. 

As you move from the higher levels of the WBS to the lower levels, the definition of the project works gets more detailed with the upper levels representing the major phases of the project. 

It is imperative to remember that the WBS represents 100% of all the work defined in the project scope. Anything that is not included in the WBS is considered out of scope for the project.
Download also:
This video will show you step by step how to Create a Work Breakdown Structure with Microsoft Project.also you can download the document from down

Uses of the Work Breakdown Structure:

  • Defining the project scope in terms of deliverables and components. 
  • Providing the framework on which the project status and progress reports are based. 
  • Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project lifecycle. 
  • Providing inputs for other project management processes like estimation, scheduling, risk assessment etc.